Finish-a-long – third quarter

2012 Finish-A-Long

Wow, we’re over halfway through the year and so far I’ve stuck to my goals in Rhonda’s Finish-a-long, so I may as well participate in part 3 too…

I’ve taken some more up to date pictures of my WIPs. So this quarter I need to finish…

The dog quilt. Out of necessity as it needs to be posted off in about 2 weeks. I have about 20% of the quilting left to finish, a bit of fabric painting and of course I need to bind and sleeve it before posting it off for the Festival of Quilts.

Another necessity is finishing the Snapdragon Quilt. My sister’s birthday is 16th July and I’m really worried I won’t get this finished. It’s just going to have simple grid quilting though so hopefully I should be fine… It’s 10 columns and I have four done so far. I have made all of the 9 patch blocks and I’m making the snowballs as I go to break up the monotony.

This time I thought I’d go for three finishes, since round 1 was one finish and round 2 was two finishes. This is not a deadline but I’m sick of it being shoved under my drawers because I haven’t got room for it in my WIP drawer. It’s my Salt Air slash quilt. The white is actually curtain lining and it’s a brilliant, dazzling white. I want to finish this for me when the pressure is off a bit, so that will hopefully be next month unless I get distracted…

 

Advertisements

One Comment

  1. Posted July 10, 2012 at 2:12 pm | Permalink | Reply

    You have a lot on your plate, my friend! Lots of lovely projects, there!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: